actual cost and the baseline cost graphs

J

John

Deep karan said:
how do we overlap the cummulative - actual cost and the baseline cost

Deep karan,
What do you mean by "overlap"? If you are trying to use the Resource
Graph feature of Project, you won't be able to get there from here. If
you want to show a graph with both Actual Cost and Baseline Cost plotted
over time, your best bet is to export the data to Excel using the
utility "analyze timescale data in Excel" and then configure the graph
as desired.

Hope this helps.
John
Project MVP
 
D

Deep Karan

Hello Mr. John

Thank you very much for replying to my querry. i followed your method and i
got the desired results.
Thnking you once more

Deep Karan
 
J

John

Deep Karan said:
Hello Mr. John

Thank you very much for replying to my querry. i followed your method and i
got the desired results.
Thnking you once more

Deep Karan

Deep,
Great! Thanks for the feedback. Sometimes I get it right.

John
 