Jim - Houston
How do I contour a project (vs. a resource) to flat? I have work spikes. Does
Project have a way to flatten work loading? I'd like to reduce the spikes.
Maybe the tool would auto generate reduced Units in the spike areas based
upon a user entered max cumulative-work level.
Project have a way to flatten work loading? I'd like to reduce the spikes.
Maybe the tool would auto generate reduced Units in the spike areas based
upon a user entered max cumulative-work level.