Özgür ÖZTÜRK
Hi,
I have got a problem at Ms Project 2007. I create a consturaction project
and there was 400+ task in it. My project's baseline cost = 30.036.049,94 $.
When i click reports, costs; cash flow i see the cash flow report. But at
cash flow report baseline cost = 30.027.081.83 $. Why these baseline costs
are not equal ? How can i fix this problem ?
Thanks.
Ozgur OZTURK