R
RC
If I assign resources (work, material, and cost) to different tasks and then
want to run a cost report at the summary task level, will I be able to
seperate out the different type of resources to see each cost individually?
For example, the total material costs for the summary task or the total work
costs for the same summary task.
Regards,
Rachel
want to run a cost report at the summary task level, will I be able to
seperate out the different type of resources to see each cost individually?
For example, the total material costs for the summary task or the total work
costs for the same summary task.
Regards,
Rachel