Can the PWA Timesheet control be extended?

D

Doug Patrone

We would like to extend the Timesheet to include three punch-in, punch-out
times for each day. The first is for the morning, the second is for lunch
and the third is for the afternoon. There is no need to track punch-in/outs
for each task, all that is required is to calculate a delta between the total
# of hours reported in all tasks for the day and the total # of hours based
on clock-in/out times. If there is a delta of 0, all time has been reported.
If it isn't 0, the manager can investigate.

As a developer, how would I prepare myself to provide a solution? I've
already downloaded the Project 2003 SDK, but haven't been able to
conceptualize a solution up to this point.

Any help (or general directions) would be most appreciated.

Thanks,
Doug
 