I have a Master Plan that contains several sub-projects. Each Sub-project
contains tasks/subtasks with different WBS structure. When I link them into
the MasterPlan they are assigned the next available WBS number. However when
expanded, the sub-tasks contain the WBS structure I defined and when I try to
sort on all the WBS,MP doesn't sort them in order.

Ex in sub proj 1 ex in Sub Proj 3
Master Plan
WBS Task WBS Task WBS
Task
1.1 A 1.1.2 A2
1 All A
1.1.1 A1 1.1.3 A3
2 All B
2.2 B 2.2.2 B2
3 @link1
2.2.1 B1
4 @Link2


Master then looks like this When Expanded
WBS
1
2
3
1.1
1.1.1
2.2
2.2.1
4
1.1.2
1.1.3
2.2.2
When I try sorting, it doesn't move 1.1,1.1.1 etc under 1.

How can I get this to work thanks