C
Coachy
I get the following message whenever I open MS Project 2006
(11.3.2007.1529.15) SP3...
no calculations can be performed now
The dates won't change when I add dependencies to the tasks. It says I have
a circular reference issue but can't determine which tasks. I manually
removed the links from a handful of tasks but there seems to be no end. I
always get the message each time I open the file. How can I save the file
and get back to the way it was working?
(11.3.2007.1529.15) SP3...
no calculations can be performed now
The dates won't change when I add dependencies to the tasks. It says I have
a circular reference issue but can't determine which tasks. I manually
removed the links from a handful of tasks but there seems to be no end. I
always get the message each time I open the file. How can I save the file
and get back to the way it was working?