smokitz
I have a large MSFT Project File and I am trying to customize a filte
remove some tasks from the incomplete task view.
I tried to change columns that are not being used, as additional filte
criteria (Flag 20 = Yes on the tasks I want to hide, and assigned a YE
to the FLAG20 column. All other tasks have Flag20 = NO). I hav
attached a screen shot of my filter.
The FLAG20 column in my expectation would be filtered with thes
criteria - but it's not. Am I doing this correctly?
I have attached a screen shot of my filter for clarity.
Thanks
+-------------------------------------------------------------------
|Filename: custom-filter_mpp.JPG
|Download: http://forums.techarena.in/attachment.php?attachmentid=6276
+-------------------------------------------------------------------
remove some tasks from the incomplete task view.
I tried to change columns that are not being used, as additional filte
criteria (Flag 20 = Yes on the tasks I want to hide, and assigned a YE
to the FLAG20 column. All other tasks have Flag20 = NO). I hav
attached a screen shot of my filter.
The FLAG20 column in my expectation would be filtered with thes
criteria - but it's not. Am I doing this correctly?
I have attached a screen shot of my filter for clarity.
Thanks
+-------------------------------------------------------------------