F
Fonnesbeck, Chris
When adding a new task or calendar event in Entourage 2004, the display of
the specified date is screwed up. Specifically, if I open the calendar and
select Sept. 8, 2005 for an event, the date of the event ends up being
displayed as:
Thu, Sep, 2005
Thus the day gets left out. This happens every time for every entry. I think
the day is being stored correctly, as it shows up on the calendar dialog
after I save it.
Any idea how to address this problem?
Thanks,
Chris
the specified date is screwed up. Specifically, if I open the calendar and
select Sept. 8, 2005 for an event, the date of the event ends up being
displayed as:
Thu, Sep, 2005
Thus the day gets left out. This happens every time for every entry. I think
the day is being stored correctly, as it shows up on the calendar dialog
after I save it.
Any idea how to address this problem?
Thanks,
Chris