P
Paul Falla
I have a scenario where the user enters a week number on
their timesheet. This is all well and good, but wjat
would like to do is add a calculated field on the form
which looks at that week number, and then shows the
corresponding date range that the week no. refers to. Eg
if the user enters 48 as the week no. then the new field
would show something along the lines of "24/11/2003 to
30/11/2003"
I have tried all sorts of ways of doing this and keep
coming up with a blank.
Any help gratefully accepted.
TIA
PAul
their timesheet. This is all well and good, but wjat
would like to do is add a calculated field on the form
which looks at that week number, and then shows the
corresponding date range that the week no. refers to. Eg
if the user enters 48 as the week no. then the new field
would show something along the lines of "24/11/2003 to
30/11/2003"
I have tried all sorts of ways of doing this and keep
coming up with a blank.
Any help gratefully accepted.
TIA
PAul