J
Jason
i've created a master schedule. I've changed the bars from roll-up task bar
to regular summary bars. Now, I need to show the %comple progress line on
these bars. The master schedule i was using with version 2000 had it done
automatically. how can i do it now with 2007? please help. need answer ASAP.
to regular summary bars. Now, I need to show the %comple progress line on
these bars. The master schedule i was using with version 2000 had it done
automatically. how can i do it now with 2007? please help. need answer ASAP.