I've recently built a new project plan out of details from multiple other
plans. A problem that I've noticed is that constraints (Must Start/Finish No
Later Than) appear to be imposed. These are not valid in our planning model
where everything starts as soon as possible with standard task dependencies
introduced.
Has anyone seen anything like this and is there a way to prevent it? I
haven't been able to recreate, unfortunately, so I feel like I'm flying blind.