A
Aurora
I am using Power Point 2000
My boss wants a 4- line graph that will appear in his presentation one line
at a time based on time or manual click. Can someone point me in the right
direction as to how to do this? I do not even know what you call this,
though I think I have seen this done before. Please Help.
My boss wants a 4- line graph that will appear in his presentation one line
at a time based on time or manual click. Can someone point me in the right
direction as to how to do this? I do not even know what you call this,
though I think I have seen this done before. Please Help.