I have submitted time for last weekend, I wasn't supposed
to work but i was able to fill time out on sat ans sunday.
Now when I go into the cube the weekend time does not
match my time sheet. It looks like it spread the total
over Fri, Sat, Sun Mon, the total was supposed to be 32
for those days and is but I get wierd numbers 9.5 5.3 2.7
7.
Can soeone tell me how to deal with weekend actuals that
was not scheduled?
Thanks
Eric