Ok, I have created a Budget Status and Schedule status graphical indicator in
the Global template (Task Text 1 and 2). When I view the fields in Project
Prof 2003 they show up as the red/yellow/green circles.
However, when I add the fields (Task Text 1 and 2) to the Task Summary View
in PWA, for the same project, the Budget Status shows up as the text value
rather than the graphical indicator. The Schedule Status shows up as #ERROR.
What am I doing wrong?