I have a facility schedule that will contain tasks occurring at various facility locations, non of the tasks will be linked to one another.
My question is i want to create a Microsoft indicator to appear, such as a red dot when there is more than 1 task occurring at the same facility within the same date range and green if there are no overlaps
I currently have the facility locations as outline code 1 field, i figured there could be some kind of formula written which a MSP graphical indicator could be applied to, for example "if outline code 1 = outline code 1 and the dates overlap then show red if not then show green"
This would provide a great visual to highlight quickly within a large schedule when a task moves if there is going to be a scheduling conflict
My question is i want to create a Microsoft indicator to appear, such as a red dot when there is more than 1 task occurring at the same facility within the same date range and green if there are no overlaps
I currently have the facility locations as outline code 1 field, i figured there could be some kind of formula written which a MSP graphical indicator could be applied to, for example "if outline code 1 = outline code 1 and the dates overlap then show red if not then show green"
This would provide a great visual to highlight quickly within a large schedule when a task moves if there is going to be a scheduling conflict