S
Steve Wade
I am trying to convince our systems folks to upgrade to
Project 2003 (so that can integrate our existing timesheet
product).
Are there any major impacts in doing this upgrade to
either the desktop or project plans created in 2000?
Project 2003 (so that can integrate our existing timesheet
product).
Are there any major impacts in doing this upgrade to
either the desktop or project plans created in 2000?