Automatically removing completed projects from Master

L

LeAnn

I am using Project 2003 and have created a master project that I have several
projects linked into. I am wondering if there is a way that when the
individual project is completed (the last task shows completed), if the
master project can automatically be updated to remove that project from the
master.

To this point, I have been going in to each one & unchecking "link to
project" and then deleting the project one by one. I didn't know if there
was an easier automated way to handle this as I only need to see OPEN
projects.
 
R

Radosław Ruciński

Could you specify the VBA method that is used to unlink project in such a
case?
 