Is it possible to make a task appear multiple times in a ms project view?
I want to make a plan which integrates an engineering plan with a production
plan. I can insert them to a master plan, and then group by area, but I would
like to make certain engineering tasks appear multiple times.
For example: The calculation of load bearing structure is a prerequisite
both for "concrete wing A" and "concrete wing B". I want to group by wing and
then get
area: Wing A
-Load bearing structure
-Concrete wing A
area: Wing B
-Load bearing structure
-Concrete wing B
Anyone know if this is possible?
Another solution would be if the "group by"-function could sort by multiple
criterias. For the example, I would get the groups "all + wing A" and "all +
wing B" where engineering tasks would be categorized as "all".
Thankful for any advice!
I want to make a plan which integrates an engineering plan with a production
plan. I can insert them to a master plan, and then group by area, but I would
like to make certain engineering tasks appear multiple times.
For example: The calculation of load bearing structure is a prerequisite
both for "concrete wing A" and "concrete wing B". I want to group by wing and
then get
area: Wing A
-Load bearing structure
-Concrete wing A
area: Wing B
-Load bearing structure
-Concrete wing B
Anyone know if this is possible?
Another solution would be if the "group by"-function could sort by multiple
criterias. For the example, I would get the groups "all + wing A" and "all +
wing B" where engineering tasks would be categorized as "all".
Thankful for any advice!