D
DW
I work at a camp where we do a triathalon in which two of the times are
weighted to make them more significant comparted to the largest even, which
is the cycling. My current formula is
=SUM(C11,PRODUCT(D11,10),PRODUCT(E11,3))
However, in order to get this to work correctly I have to put the times
(i.e. 22:04, 0:26, & 2:15) into seconds (i.e. 1324, 25.9, & 135) by hand and
then covert the final sum (1988) back into time format (33:08), once again by
hand. I tried converting my table into TIME, but it sets my times to clock
times using AM and PM as opposed to the number of minutes and seconds I was
going for. Any suggestions on how to make my spreadsheet work?
weighted to make them more significant comparted to the largest even, which
is the cycling. My current formula is
=SUM(C11,PRODUCT(D11,10),PRODUCT(E11,3))
However, in order to get this to work correctly I have to put the times
(i.e. 22:04, 0:26, & 2:15) into seconds (i.e. 1324, 25.9, & 135) by hand and
then covert the final sum (1988) back into time format (33:08), once again by
hand. I tried converting my table into TIME, but it sets my times to clock
times using AM and PM as opposed to the number of minutes and seconds I was
going for. Any suggestions on how to make my spreadsheet work?