Hi,

We are having a problem when creating all day
appointments in outlook 2003; whenever we specify an all
day event it takes up two days. For example, an all day
event set for the 24th will actually display from the
24th at 12AM to the 25th at 12AM. Checked timezones
throughout the systems with Outlook installed and they're
all good. Not sure if it's related or not but we are
connected with exchange 2003 on an SBS 2003 server,
checked the timezone there as well and it's proper. I
have tried reinstalling Outlook on both client systems
but that didn't work, and I can't seem to find out
anything else (other than system time zones) which could
be the issue, any ideas/suggestions would be greatly
appreciated.

Thanks,

Peter
 