V
vansix
Hi.
I track numbers on a daily basis over a period of a month (keeping
running list of the numbers).
Generally it is a smaller number subtracted from a larger number an
that result is then subtracted from the next day's value, then tha
value from the next days value, etc. etc.
As I generate a new number for each new day, I want that new value t
be assigned to the same cell in a daily report that I have to submit.
Currently I have 31 copies of the same report (representing each day o
the month) that corrilate with each days result.
But...there must be an easier way to do this.
Thanks for any help anyone might be able to give me!
Vansi
I track numbers on a daily basis over a period of a month (keeping
running list of the numbers).
Generally it is a smaller number subtracted from a larger number an
that result is then subtracted from the next day's value, then tha
value from the next days value, etc. etc.
As I generate a new number for each new day, I want that new value t
be assigned to the same cell in a daily report that I have to submit.
Currently I have 31 copies of the same report (representing each day o
the month) that corrilate with each days result.
But...there must be an easier way to do this.
Thanks for any help anyone might be able to give me!
Vansi