Assignment Timephase - PS 2007

C

Colin

I'm a bit confused with the different measures in the cube. I've submitted
some time in my timesheets but they aren't showing up in "Actual Work" after
a cube build. It does show up in the measure "Actual Work Billable". What
is the difference between the two measures?
 
Top