Calculation of "Risk Factor" in MS Porject Server/Portal

S

Scott E

Would anybody know what drives the calculation of the "Risk Factor" in
the Risk Summary Report on MS Project Server/Portal.

I understand it has to do with the numbers or level of severity we
input into the Risk Impact, Risk Porbability and Level of Control
fields, but is ther a certain formula that that is used to generate and
assign a Risk Factor #s like 9.0 or 1.5? Any advice would be great.

Thanks
 