Can the hours change the duration instead of the duration changingthe hours?

G

Goobie

If I put a resource in and put down 16 hours it shows the resource as
overallocated. When I change the duration to two days it changes the
hours to 32 hours.

Is there a way the hours can drive the dates?
 