L
Luther
Hello,
I need help !!!
On a project, I need to do the following:
1. Turn a row BLUE based on comparing the "Expected
Finish Date" (date1) and the date when the report was
printed (date2). The relationship between the two should
be date1 < date2.
Is this at all possible?
I need help !!!
On a project, I need to do the following:
1. Turn a row BLUE based on comparing the "Expected
Finish Date" (date1) and the date when the report was
printed (date2). The relationship between the two should
be date1 < date2.
Is this at all possible?