This formula will check the range A1:A6 for dates earlier than 3/4/2007 and
later than 1/4/2007 i.e. for the date 2/4/2007 and will then summ the
corresponding cells in B1:B6.
This formula will check the range A1:A6 for dates earlier than 3/4/2007 and
later than 1/4/2007 i.e. for the date 2/4/2007 and will then summ the
corresponding cells in B1:B6.