Pete Chrisbacher
Re: Project Pro 2003
Is there some way to set the default utilization either for all resources or
on a resource by resource basis? I'd like the default to be 200%, not 100%.
It's a pain to have to manually open the resources tab every time I create a
new task and reset utilization to 200%.
I realize that "copy down" copies both task resource assignment and
utilizaiton - just wondering if there's an easier way.
Thanks!
-Pete