When I do datediff("m", [projstart],[projend])
with 1/1/09 and 3/15/09 i get 3 months is there any way to get 3.5 months
I have the format set to standard
I need the answer to be at least one decimal.
Thanks
with 1/1/09 and 3/15/09 i get 3 months is there any way to get 3.5 months
I have the format set to standard
I need the answer to be at least one decimal.
Thanks