N
Noel
MS Project 2003: When I change the duration of a task, the dates don't equal
the duration time. If the duration is 3 days, the dates are showing 4 days.
How do I fix this?
Thanks
the duration time. If the duration is 3 days, the dates are showing 4 days.
How do I fix this?
Thanks