Putting in dates for three months(From week 1 thur week 16)
B Bob Phillips Feb 15, 2006 #2 Put the first date in A1. In A2, put =A1+7 copy down as far as is needed. -- HTH Bob Phillips (remove nothere from the email address if mailing direct)
Put the first date in A1. In A2, put =A1+7 copy down as far as is needed. -- HTH Bob Phillips (remove nothere from the email address if mailing direct)