Seems to be only in Outlook 2003 but appointments times are improperly
adjusted for daylight savings time. With the Adjust for Daylight Savings box
checked in both System Date/Time settings plus in the Outlook XP (2002) or
Outlook 2003 Calendar seetings when synchronizing with an Exchange Server my
XP users appointments are OK but the 2003 users appointments have all moved
back an hour and all day events span 2 days. Appointments change back to the
correct time by removing the check mark within the Outlook 2003 Calendar
settings. Assuming a fix is not in place by October the check mark will need
to put back into the Outlook 2003 Calendar settings to correct the problem
again.
adjusted for daylight savings time. With the Adjust for Daylight Savings box
checked in both System Date/Time settings plus in the Outlook XP (2002) or
Outlook 2003 Calendar seetings when synchronizing with an Exchange Server my
XP users appointments are OK but the 2003 users appointments have all moved
back an hour and all day events span 2 days. Appointments change back to the
correct time by removing the check mark within the Outlook 2003 Calendar
settings. Assuming a fix is not in place by October the check mark will need
to put back into the Outlook 2003 Calendar settings to correct the problem
again.