Is it possible to set a default rate table other than A for a project? For
example, I have a project than must use a different rate than the normal
table A rate. I will create a table B rate. But do I need to change every
resource on every task to use the table B rate OR is there a faster way to
tell MS Project to use table B?
Thanks