Hi,
I have an enterprise deployment of Project Server 2003 with over 1500 users.
I have 43 inter related projects with direct relationships (from task a of
project 1 to task b of project 2).
On occassion I will open project 1 and not see the link(s) to project 2 (no
ghost task, no information about it in the preds/succs list). If I then
close project 1 and open project 2, I'll see the link(s) (in all places
mentioned above). Then if I open both projects the tool re-establishes the
link(s) and it/they becomes visible in project 1 again.
Standard views, no filters applied, I've checked the options and ensured I
can see ghost tasks on the project.
Anyone else ever seen this?
Thanks,b
I have an enterprise deployment of Project Server 2003 with over 1500 users.
I have 43 inter related projects with direct relationships (from task a of
project 1 to task b of project 2).
On occassion I will open project 1 and not see the link(s) to project 2 (no
ghost task, no information about it in the preds/succs list). If I then
close project 1 and open project 2, I'll see the link(s) (in all places
mentioned above). Then if I open both projects the tool re-establishes the
link(s) and it/they becomes visible in project 1 again.
Standard views, no filters applied, I've checked the options and ensured I
can see ghost tasks on the project.
Anyone else ever seen this?
Thanks,b