S
SteveR
We have configured P2002 to track baseline data for four
separate phases throughout the project life cycle by
utilizing the Baseline 1-4 fields. We would like to have
this data displayed in various reports within PWA, however
only the root level Baseline data can be displayed in the
Tracking/Gantt chart formats.
Has anyone figured out how to display Baseline 1-10 data
in PWA?
separate phases throughout the project life cycle by
utilizing the Baseline 1-4 fields. We would like to have
this data displayed in various reports within PWA, however
only the root level Baseline data can be displayed in the
Tracking/Gantt chart formats.
Has anyone figured out how to display Baseline 1-10 data
in PWA?