When I try to add resources from the Enterprise Resource pool to some
projects I get an error message on opening the pool which tells me that the
Reserved_Resume_Date on row 1211 is outside an acceptable range. Carrying on
with the task gets me another message which tells me that the
Reserved_Stopdate on the same line is outside the range. Carrying on again
allows me to add the resources. The problem line is not the same every time
- any ideas as to what is going wrong?
 