J
Jenny
Hi,
I have a power point presentation that has many slides with embedded Excel
files which are pulling data directly from Hyperion - however, as many of the
slide are showing the same information, rather than having each slide linked
to Hyperion I would rather link the Embedded Excel file to another embedded
excel file within the same PPT document - ie link an excel file on slide 3 to
an excel file in slide 5 so everytime there is a chnage to one number I dont
have to update mulitple slides, I can just update 1 slide and know the
changes flow through onto all the other slides - is this possible?
Thanks
I have a power point presentation that has many slides with embedded Excel
files which are pulling data directly from Hyperion - however, as many of the
slide are showing the same information, rather than having each slide linked
to Hyperion I would rather link the Embedded Excel file to another embedded
excel file within the same PPT document - ie link an excel file on slide 3 to
an excel file in slide 5 so everytime there is a chnage to one number I dont
have to update mulitple slides, I can just update 1 slide and know the
changes flow through onto all the other slides - is this possible?
Thanks