Question---2 separate schedules are externally linked in Project Server---If
one of them slips, a pop-up dialog window should appear for the other
alerting them of the slip. The 2nd schedule has the option to accept the
slippages (accept all) or reject. When accepting the slippage alerts and
saving, the dialog boxes should not appear anymore when re-opening the
schedule. The problem is that the pop-up alerts are continuing to appear
even though the 2nd schedule already accepted the slippages. Thoughts?