Hi

I am graphing a straight line. For the first part (6 months) I want to
use the actual figures and for the second 6 months I want to use a
forecast. Is there some way on excel that I can have the first 6
months as a full line line, and have the second 6 months as dot points?

Thanks

Greg
 