I have several projects running. I would like to display on or near the
Gantt bars the costs associated as the project goes along and draws as I get
paid for those projects. For example $12,000 is a draw and ($6,500) as a
cost. I need them to show up along the Gantt bar on specific dates. How do
I do that? thanks.
Gantt bars the costs associated as the project goes along and draws as I get
paid for those projects. For example $12,000 is a draw and ($6,500) as a
cost. I need them to show up along the Gantt bar on specific dates. How do
I do that? thanks.