S
Shazza
Working on Excel 2000. Cay you put 2 axis onto a chart that could show a
timeline plus the text values. Ie i work with ferries and have grids to show
a time line of how long the ferry takes to make the crossing. I would also
like to show the labels of what is happening ie Depart, accellerate, double
accellerate, de crease speed, dock. I need to show these labels with the
timelines that marry up with the scale on the chart ie 10 15 20 30
timeline plus the text values. Ie i work with ferries and have grids to show
a time line of how long the ferry takes to make the crossing. I would also
like to show the labels of what is happening ie Depart, accellerate, double
accellerate, de crease speed, dock. I need to show these labels with the
timelines that marry up with the scale on the chart ie 10 15 20 30