I was asked to develop a DB to track the Daily Production with Loss time and
Defects by line.
Here is all datas what needs to be stored, please check if you can help
about how the relationship must be created, if you have an example it should
be better.
Line: 7 Date: 9/5 Shift: 1st
Time: WO: Qty HeadCount Lost Time:
7:00 to 8:00 125401 10 9 SetUp: 10 Min
125405 15 Lunch: 15 Min
125406 15 this WO had:
Defects Code:
Incorrect End = 1
Assembly Inc = 3
Heat sink Dam =2
Time: WO: Qty HeadCount Lost Time:
8:00 to 9:00 125402 10 8 SetUp: 5 Min
125407 15 this WO had:
125408 15
Defects Code:
Incorrect End = 1
Assembly Inc = 2
Heat sink Dam =4
Thanks
LD
Defects by line.
Here is all datas what needs to be stored, please check if you can help
about how the relationship must be created, if you have an example it should
be better.
Line: 7 Date: 9/5 Shift: 1st
Time: WO: Qty HeadCount Lost Time:
7:00 to 8:00 125401 10 9 SetUp: 10 Min
125405 15 Lunch: 15 Min
125406 15 this WO had:
Defects Code:
Incorrect End = 1
Assembly Inc = 3
Heat sink Dam =2
Time: WO: Qty HeadCount Lost Time:
8:00 to 9:00 125402 10 8 SetUp: 5 Min
125407 15 this WO had:
125408 15
Defects Code:
Incorrect End = 1
Assembly Inc = 2
Heat sink Dam =4
Thanks
LD