How determine if MsProject file saved in 2003 or 2007 version?

L

leighg

I'm having difficulty with MsProject 2007 Professional - I think it may be
because I'm switching back and forth between saving files as 2003 vs. 2007.
How can I quickly determine which format was used to save the file before I
open it?
 
Top