Rollerdad,
There are basically two types of resources, Work and Material. The type
can be set on the Resource Sheet using the Type field.
If on the other hand you mean specific versus generic resources, that
option is available by displaying the Generic field on the Resource
Sheet.
Hope this helps.
John
Project MVP