M
mtbcpa
Outlook 2003 - I have my calendar views showing in the left side
navigation pane by selecting View/Arrange By/Show Views in Navigation
Pane. I have created 2 custom views and would like them to show at the
top of the list, not the bottom. Anyone know of a way to do this?
Thanks!
navigation pane by selecting View/Arrange By/Show Views in Navigation
Pane. I have created 2 custom views and would like them to show at the
top of the list, not the bottom. Anyone know of a way to do this?
Thanks!