S
Sanford Lefkowitz
I would like to hae a statement like:
IF(A1>0,1/1/2004)
interpreting 1/1/2004 as a date.
EXCEL is doing the arithmetic and giving me the result of the division.
I could figure the numeric date and do something like:
IF (A1>0,37987)
but that seems rather awkward.
What else can I do.
TIA
Sanford
IF(A1>0,1/1/2004)
interpreting 1/1/2004 as a date.
EXCEL is doing the arithmetic and giving me the result of the division.
I could figure the numeric date and do something like:
IF (A1>0,37987)
but that seems rather awkward.
What else can I do.
TIA
Sanford