M
Miguel Velez
I'm trying to import data from an Ms Access Database into
Ms Project. I've tried doing it by having Access create an
Ms Excel spreadsheet which I then import into Ms Project.
I've created my own maps with in Project.
When I import it into a blank project, it works fine and
all data is imported correctly. When I try to import the
spreadsheet into an existing project file (i.e the one I
created in the first place by this method), Ms Project
crashes with the following error"
'The instruction at "0x3018ee7" referenced at
menory "0x00000001". The memory could not be "read".'
Does anyone know why this occurs? What could cause it? Is
there anyway I can stop this error?
Ms Project. I've tried doing it by having Access create an
Ms Excel spreadsheet which I then import into Ms Project.
I've created my own maps with in Project.
When I import it into a blank project, it works fine and
all data is imported correctly. When I try to import the
spreadsheet into an existing project file (i.e the one I
created in the first place by this method), Ms Project
crashes with the following error"
'The instruction at "0x3018ee7" referenced at
menory "0x00000001". The memory could not be "read".'
Does anyone know why this occurs? What could cause it? Is
there anyway I can stop this error?