when we save timings through rehearse timings in PPT , the PPT automatically
saves the slide timings as well as timings between the animations .
We can see the slide timings and can also extract them programatically .
But can we get to know the timings between 2 consecutive animations.
Is this possible?
I believe it should be since PPT saves it somewhere only then it is able to
replay it exactly in the same manner.

If this is possible then how can this information be viewd or extracted.

thanks,
Abhishek
 
S

Shyam Pillai

Information of the build timing is stored in each slide as a tag - 'TIMING'
 
A

Abhishek

How can we get this tag "TIMING" is there any way that I can fetch this
value

thanks,
Abhishek
 
A

Abhishek

Thanks steve
Its solved my lots of problems.
The only issue now left is to manage the array that it returns thats not a
problem

thanks a lot

Regards,
Abhishek
 