KL Changing max units and cube

C

Cleo

Is it possible to make the cube run before the normally scheduled
time? I've change the max units from decimal to percentage and I want
to see if it clears up the bizzare numbers I have been seeing.
 
J

Jonathan Sofer

What version are you on? 2003 or 2007?

You can always force the cube to rebuild through the administration page.
Just be aware that this can take a while to run and can cause a drain on the
performance if you run it during business hours. This performance
degradation of course depends on your hardware configuration and how heavily
your system is being used.

Jonathan
 
J

Jonathan Sofer

You can force the cube to be rebuilt on demand both in 2003 and 2007 MSPS.
You will need administration rights to do so.

I believe that 2003 had a restriction to only be able to run on demand if
you were logged onto the project front end server but that this was fixed
post SP1 or SP2.

Be aware that running the cube during business hours can derogate
performance for users.

Jonathan
 