LifeCycle in Project 2003

N

Nbruening

How do I create an itirative model in MS Project 2003 as opposed to a
Waterfall model?
 
R

Rod Gill

Either have a high level summary task for each iteration, or have a separate
file for each iteration if the iteration has a lot of tasks. Start with the
first option and move to multiple files if you get too many tasks in one
file.

--

Rod Gill
Project MVP